Design Drawings Approval Procedures
Based on the rental day Application Processing (Approval) Procedures Remarks
7 days before Receive various applications and reports on operating regulations including an application for technical supports

- Submit entire documents such as design drawings (including separate attachments): organizer

- Submit a work report (including separate attachments): constructor

Hall Manager
(Document supplementation) Return and supplementation request for matters in violation of operating regulations and related laws (receive documents again) Hall Manager
Review and approval on applications Approval after review based on operating regulations and related laws

- Attach (check) a certificate of flame retardant (performance) floor and finishing materials)

- Attach (check) the layout of heavy objects, load distribution plan

- Attach (check) the quantity of dangerous objects, safety control plan

Advertising and guide facilities: approval under approval standards and procedures

Approval by SETEC
3 days before

- Submit facility related documents such as an application for technical supports to the person in charge of facility operations.

- The person in charge of facility operations informs Exhibition Center Hall Manager of the presence or absence of abnormality.

Hall Manager
Person in charge of facilities
2 days before Inform the event organizer and installer of approval

- Installer : receive the approval letter.

Hall Manager Submitting companies
1 day before Prior check on exhibition facilities with the organizer, installers and security guard company (regarding restorations) )

- Including the organizer office (transfer and succession)

- Receive a pass from constructors.

- Deliver security guard work instructions (person in charge of security guard company receives instructions.)

Hall Manager

Installers Security guard company
Construction period Installations and construction control: control based on operating regulations, applications and design drawings

- Principles of same constructions as those of design drawings in accordance with regulations and related laws

- Forced dismantlement of installations or constructions without permission or in breach of regulations or laws, warning to installers

- Completion of constructions : Each constructor: submit the list of stationing personnel

- Removal of construction materials, disposal and arrangement of construction residues (special wastes)

Hall Manager

Installers

Exhibition
period
Energy supply an hour before opening, turn off 30 minutes after closing

Power supply for 24 hours: separately control by constructors

Hall Manager
Dismantling
time
urn off main power after exhibition ends. (discuss the timing with the organizer.) Check the stationing at the dismantling site during the time. (Prevent damage to facilities.)

- Turn off power, compressed air and water supply. (Turn them off after discussions with the organizer.)

- Check the removal of exhibited products, dismantlement of installations and cleaning.

- Check the quantity of wastes including garbages and need of restorations.

Hall Manager
Organizer

Final Constructors return their pass. (Expenses requested if they are lost.) Check and notify energy use amount, matters to be restored, and quantity of garages and wastes. Hall Manager